432 perfectly laid, level and evenly spaced subway tiles…yeah…I take after my mom! We’re perfectionists and it pays off big time when you tile a bathroom shower.
It was your typical weekend project at the Bohovich-Campbell compound. The old (and by old I mean the four month old sheetrock that we had put up temporarily as shower walls) shower walls came out and the new went up. Friday night we spent taking down the sheetrock, putting up the new durock, and laying the first row of tile. Saturday I spent laying the remaining tiles and Sunday was grout day. In the end, we were left with a perfect shower!
[…] And here’s a little flashback into the bathroom demo, an oldie but a goodie. And here is where we painted it yellow. And while we’re at it, we can’t forget when we tiled the bathroom floor here and the shower here. […]
[…] the tub tossing found here and here, installed the shelves, tiled the floor here and the shower here, moved in the plant, grout sealed, installed towel hooks and labels here, then did it again more […]
[…] the tub tossing found here and here, installed the shelves, tiled the floor here and the shower here, moved in the plant, grout sealed, installed towel hooks and labels here, then did it again more […]